Xi’an No.4 Wastewater Treatment Plant
Equipment installed: Inward-Flow Plate-Type Fine Screen (Centrefilte Band Screen).
Equipment function: High-precision fine screening (1–5 mm), preventing fibers, plastics and hair from entering downstream biological and sludge systems. Increases interception efficiency and stabilizes overall plant operation.
Commissioning: 2021
Plant treatment capacity: 500,000 m³/day.
Xi’an No.6 Reclaimed Water Plant
Equipment installed: Inward-Flow Plate-Type Fine Screen.
Equipment function: Ultra-fine screening under high-reuse and high-quality effluent requirements. Removes fine solids and fibers to protect downstream filtration units.
Commissioning: 2021
Treatment capacity: 400,000 m³/day.

Xianyu River Wastewater Treatment Plant
Equipment installed: Inward-Flow Super Mesh Screen (Centrefilte-HC).
Equipment function: High-capacity fine screening under complex inlet conditions—large debris load, fluctuating flow and limited civil space. The original case reports that super mesh panels increased hydraulic capacity by nearly 3×.
Commissioning: 2023
Plant treatment capacity: 200,000 m³/day.

Yixing Cangpu Pump Station
Equipment installed: Inward-Flow Rake-Type Bar Screen (Centrefilte Bar Screen).
Equipment function: Replaced failed grinder screens; prevents pump clogging, stabilizes pump station operation and ensures continuous flow.
Commissioning: 2023
Daily design capacity: 80,000 m³/day
Actual capacity: 35,000–40,000 m³/day.
Equipment supply from G-LINK