Model 403 Treating DAF Sludge: An Operating-Cost Example

Operating conditions and cost analysis for a screw press 403 treating DAF scum sludge.

A WWTP applied a screw press 403 to treat DAF scum sludge. Here are the operating conditions and the cost analysis.

Operating cost analysis

Original case values, using China-based reference prices
ItemBasisReference priceUSD/kg dry solids
LabourOne operatorUSD 700/month0.0049
Power5.6 kWUSD 0.13/kWh0.0017
Polymer3 kg/tonne dry solidsUSD 2,800/tonne0.0084
Water96 L/hUSD 0.50/m³0.00006
Cost shares: polymer 55.8%, labour 32.5%, power 11.3%, water 0.4%

Total Operating Cost

Total OPEX ≈ 0.015 USD/kg-DS = ~15 USD per ton-DS

Key Takeaways

  • Even with DAF scum at 3.5% DS, screw press 403 maintains very low OPEX in this application.
  • Polymer control and regular maintenance are crucial for stable cake dryness and cost reduction.
  • Actual OPEX will vary depending on sludge type and the screw press model used.
  • At G-LINK, we supply the equipment and coordinate support from equipment selection and polymer recommendations to maintenance guidance, helping clients improve efficiency and reduce lifecycle cost.

Welcome to consult with us if you would like to discuss your own sludge application.

All values use China-based reference prices (labour 700 USD/month, polymer 2,800 USD/ton, power 0.13 USD/kWh, water 0.5 USD/m³). Actual costs should be adjusted according to local tariffs and procurement costs.