Equipment scope

Multi-Plate Screw Press

Build your dewatering package around the sludge you handle.

← Equipment directory

Start your equipment selection

Send your industry and sludge-generating process, flow and feed solids. Unknown details can be left blank.

Download Screw Press RFQ (.xlsx)

Typical project applications

Sludge dewatering within a project-defined sludge handling package.

Equipment supply scope

  • Multi-plate screw press
  • PAM preparation and dosing system, as required
  • Sludge feed pump and dosing pump, as required
  • Screw conveyor for cake handling, as required

From sludge feed to dewatered cake

Polymer-conditioned sludge enters the screw filtration assembly. Water drains through the gaps between the fixed and moving rings as the screw carries solids toward the discharge. Increasing compression forms the discharged cake.

Plan the complete dewatering line

  • Feed: industry and sludge-generating process, average and peak flow, feed dry solids.
  • Conditioning: polymer type, preparation and dosing; available sludge trial results.
  • Outputs: cake handling, filtrate return and wash-water connections.
  • Installation: access, operating hours, materials, electrical supply and controls.

Equipment selection

We review dry-solids loading as well as hydraulic flow. Send both figures when available; a model number alone does not establish capacity or cake solids for your sludge.

Key information for quotation

  • Sludge source
  • Sludge flow rate and feed solids content
  • Target cake solids content
  • Required voltage and material
Request an Equipment Quote ↗